Wildcat Foam Station

 

  U.S. Coast Guard Approval Required          __Yes                  __No

  Tank Size          __  60 Gal.          __ 35 Gal.   __  Other Size ______  Gal.

  Tank Type Stainless         ___  304SS          ___  316SS          ___  Other SS  

  Manifold Material          __  304 SS          __  316 SS       __ Galv.   __ Brass

  Eductor          __  Magnum          __  Akron          __Elkhart __By-Pass

  Eductor Flow __  30gpm          __60gpm          __95gpm          __125gpm

  Nozzle  __Akron__3716__ 1715__3015__3019__3721__Other

             __  Elkhart __SFL-N ___SFL-B ___SFL

NOTE:  Flow rate of eductor and nozzle must match for unit to operate.

  Reel           __Galv.          __Stainless Steel          __Aluminum          __Carbon Steel

  Hose           __50ft.          __75ft.          __100ft.          __125ft.          __150ft.

  Hose Working Pressure               __150psi          __200psi          __250psi          __300psi

  Paint - __  Painted unit comes with tank, reel and manifold painted red.

  Roller Guide ___ Yes  ___No     Hose Reel Cover ____Yes  ____No

  Wildcat Unit Cover          __Yes                  __No

 

For Coast Guard Approved Unit Specifications are Pre Determined

 

  Wildcat Features

 

  Unit consists of a live hose reel, hose, nozzle, a stainless steel foam concentrate tank and a by-pass manifold.  Water is introduced from a separate source into the manifold.  Two valves allow for the selection of diversion of water either through an eductor, which draws a pre-determined percentage of foam concentrate out of the tank thus producing foam solution, or for diverting the water flow around the eductor producing a plain water flow.  The hose reel and hose is of a continuous flow type meaning that the hose does not have to be unrolled from the reel to operate.  The hose is a non-collapsible type with a fixed GPM nozzle attached.  To operate, open the valve of choice, if foam valve is open, also open the foam concentrate valve located on the supply tank.  Unreel the amount of hose desired, open nozzle bale, adjust pattern and fight fire.  It is important to match the eductor and nozzle for GPM flow.

 

  Contact________________________  Company_____________________

  Phone________________Fax________________E-Mail______________